docs(ui): finalize MVP plan structure + de-archaeologize topic docs #25

Merged
developer merged 1 commits from feature/ui-finalization-plan into development 2026-05-21 21:25:06 +00:00

1 Commits

Author SHA1 Message Date
Ilia Denisov a89048f6c5 docs(ui): finalize MVP plan structure and de-archaeologize topic docs
MVP web client (Phases 1-30) is complete; reorganize planning + living docs around that.

- PLAN.md kept as the staged MVP record (1-30) with a status block + pointers; removed the 31-36 stages, regression scenarios, and deferred-TODO section (moved out); fixed a stale cross-machine plan path.

- ui/PLAN-finalize.md (new): active web-finalization plan in 8 stages (visual system, a11y, i18n, error UX, PWA, build hygiene, docs, owner manual-QA loop); absorbs former Phases 33 and 35.

- ui/ROADMAP.md (new): post-MVP (Wails, Capacitor, realistic projection, acceptance + regression scenarios) and triaged deferred follow-ups.

- ui/docs/README.md (new): grouped topic-doc index.

- De-archaeologized all 20 ui/docs topic docs + ui/README.md + ui/core/README.md: stripped Phase-N build history, rewritten as current-state; deferred work now points at ROADMAP.md / PLAN-finalize.md. Docs-only; no code change.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-21 23:17:51 +02:00