docs(ui): finalize MVP plan structure + de-archaeologize topic docs #25

Merged
developer merged 1 commits from feature/ui-finalization-plan into development 2026-05-21 21:25:06 +00:00
Owner

Reorganizes the UI planning and living docs now that the MVP web client (Phases 1-30) is complete.

  • PLAN.md = staged MVP record (1-30) + status/pointers; 31-36, regression, and TODO sections moved out; stale plan path fixed.
  • ui/PLAN-finalize.md (new) = active web-finalization plan (F1 visual system, F2 a11y, F3 i18n, F4 error/state UX, F5 PWA, F6 wasm-in-CI, F7 docs, F8 owner QA loop).
  • ui/ROADMAP.md (new) = post-MVP (Wails, Capacitor, realistic projection, acceptance + regression) + triaged deferred follow-ups.
  • ui/docs/README.md (new) = topic-doc index.
  • De-archaeologized 20 topic docs + both READMEs (stripped Phase-N history → current state).

Docs-only; no code or behaviour change.

🤖 Generated with Claude Code

Reorganizes the UI planning and living docs now that the MVP web client (Phases 1-30) is complete. - PLAN.md = staged MVP record (1-30) + status/pointers; 31-36, regression, and TODO sections moved out; stale plan path fixed. - ui/PLAN-finalize.md (new) = active web-finalization plan (F1 visual system, F2 a11y, F3 i18n, F4 error/state UX, F5 PWA, F6 wasm-in-CI, F7 docs, F8 owner QA loop). - ui/ROADMAP.md (new) = post-MVP (Wails, Capacitor, realistic projection, acceptance + regression) + triaged deferred follow-ups. - ui/docs/README.md (new) = topic-doc index. - De-archaeologized 20 topic docs + both READMEs (stripped Phase-N history → current state). Docs-only; no code or behaviour change. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
developer added 1 commit 2026-05-21 21:17:52 +00:00
MVP web client (Phases 1-30) is complete; reorganize planning + living docs around that.

- PLAN.md kept as the staged MVP record (1-30) with a status block + pointers; removed the 31-36 stages, regression scenarios, and deferred-TODO section (moved out); fixed a stale cross-machine plan path.

- ui/PLAN-finalize.md (new): active web-finalization plan in 8 stages (visual system, a11y, i18n, error UX, PWA, build hygiene, docs, owner manual-QA loop); absorbs former Phases 33 and 35.

- ui/ROADMAP.md (new): post-MVP (Wails, Capacitor, realistic projection, acceptance + regression scenarios) and triaged deferred follow-ups.

- ui/docs/README.md (new): grouped topic-doc index.

- De-archaeologized all 20 ui/docs topic docs + ui/README.md + ui/core/README.md: stripped Phase-N build history, rewritten as current-state; deferred work now points at ROADMAP.md / PLAN-finalize.md. Docs-only; no code change.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
developer merged commit 44ed0a90eb into development 2026-05-21 21:25:06 +00:00
developer deleted branch feature/ui-finalization-plan 2026-05-21 21:25:06 +00:00
Sign in to join this conversation.