a89048f6c59ae3f37c7d0d2a4ac896abf7f0799e
MVP web client (Phases 1-30) is complete; reorganize planning + living docs around that. - PLAN.md kept as the staged MVP record (1-30) with a status block + pointers; removed the 31-36 stages, regression scenarios, and deferred-TODO section (moved out); fixed a stale cross-machine plan path. - ui/PLAN-finalize.md (new): active web-finalization plan in 8 stages (visual system, a11y, i18n, error UX, PWA, build hygiene, docs, owner manual-QA loop); absorbs former Phases 33 and 35. - ui/ROADMAP.md (new): post-MVP (Wails, Capacitor, realistic projection, acceptance + regression scenarios) and triaged deferred follow-ups. - ui/docs/README.md (new): grouped topic-doc index. - De-archaeologized all 20 ui/docs topic docs + ui/README.md + ui/core/README.md: stripped Phase-N build history, rewritten as current-state; deferred work now points at ROADMAP.md / PLAN-finalize.md. Docs-only; no code change. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
Description
No description provided
Languages
Go
52%
TypeScript
38.1%
Svelte
8.8%
Go Template
0.3%
Makefile
0.3%
Other
0.3%