eeaad62b10
- internal/postgres: pgx-over-database/sql pool (otelsql), embedded goose
migrations into schema 'backend', committed go-jet code + cmd/jetgen tool.
- internal/account: durable accounts + unified telegram/email identities
(UUIDv7 keys), find-or-create provisioning with unique-conflict handling.
- internal/session: opaque 256-bit tokens stored as a SHA-256 hash, revoke-only
(no TTL); write-through cache gating /readyz; store + service.
- internal/telemetry: OTel tracer/meter providers (none/stdout) + request-timing
middleware; internal/config gains Postgres + OTel env loading.
- internal/server: /api/v1 {public,user,internal,admin} skeleton + X-User-ID
middleware; /readyz checks DB ping + cache; main wires
telemetry -> db+migrate -> warm cache -> server.
- Tests: unit + integration (build tag 'integration', testcontainers
postgres:17) for migrations, accounts, sessions, readyz; new integration.yaml.
- Docs: ARCHITECTURE, TESTING, PLAN refinements, root + backend READMEs.
Session/account REST handlers deferred to Stage 6 (gateway); OTLP + dashboards
to Stage 11.
41 lines
1.9 KiB
Markdown
41 lines
1.9 KiB
Markdown
# Scrabble Game — Testing
|
|
|
|
How the project is tested and the gate every stage must pass. Read before adding
|
|
tests or touching CI.
|
|
|
|
## Layers
|
|
|
|
- **Go unit tests** — table-driven where it helps; `testing` + standard library.
|
|
Every functional change ships with regression coverage. Run:
|
|
`go test -count=1 ./backend/...` (the module list grows with the workspace).
|
|
- **Integration** *(Stage 1+)* — Postgres-backed tests behind the `integration`
|
|
build tag spin a throwaway `postgres:17-alpine` via `testcontainers-go`. They
|
|
live in `backend/internal/inttest` and run with
|
|
`go test -tags=integration -count=1 -p=1 ./backend/...` (needs Docker), guarded
|
|
by a separate CI workflow (`integration.yaml`; Ryuk disabled, serial). Slow.
|
|
- **UI** *(introduced with the UI in Stage 7)* — Vitest (unit) + Playwright
|
|
(e2e), mirroring the chosen plain-Svelte + Vite toolchain.
|
|
- **Engine** — correctness of scoring and move generation is owned by
|
|
`scrabble-solver`'s own GCG-backed tests. The backend adds regression tests
|
|
for end-conditions, the 24-hour timeout / auto-resign, robot balance and
|
|
margin targeting, and **dictionary-independent history replay**.
|
|
|
|
## Principles
|
|
|
|
- A green run must not depend on cached state: use `-count=1` in CI.
|
|
- Tests that need infrastructure fail loudly (`t.Fatal`) when it is unavailable
|
|
rather than silently skipping coverage.
|
|
- No network or real platform calls in unit tests; validate platform
|
|
credentials behind an interface seam and test with fixtures.
|
|
|
|
## Per-stage CI gate
|
|
|
|
Every completed stage is exercised on `gitea.iliadenisov.ru` before it is marked
|
|
done in [`../PLAN.md`](../PLAN.md):
|
|
|
|
1. Commit the stage on its `feature/*` branch.
|
|
2. Push to `origin`.
|
|
3. Watch the run to completion — never hand-roll a poll loop:
|
|
`python3 ~/.claude/bin/gitea-ci-watch.py` (launch in the background).
|
|
4. Only after every workflow that fired is green may the stage be marked done.
|