R1: mark done in PRERELEASE.md (post-merge close-out) #32
+7
-4
@@ -17,7 +17,7 @@ the edge before prod. Each phase maps back to the owner's raw pre-release TODO l
|
||||
|
||||
| # | Phase | Raw TODOs | Status |
|
||||
|---|-------|-----------|--------|
|
||||
| R1 | Schema & naming reset | 1 + 10 | **in review** |
|
||||
| R1 | Schema & naming reset | 1 + 10 | **done** |
|
||||
| R2 | Stress harness + contour observability + early run | 9a | todo |
|
||||
| R3 | Edge hardening | 2 + 8 + 3 | todo |
|
||||
| R4 | Push enrichment + kill the last poll | 4 + 5 | todo |
|
||||
@@ -214,6 +214,9 @@ Then Stage 18.
|
||||
- **Migrations squashed** 12 → one hand-written `00001_baseline.sql`. Verified by a
|
||||
`pg_dump --schema-only` diff (the chain vs the baseline are **identical** but for the two intended
|
||||
variant-CHECK values) plus the green integration suite. **No data migration** (no production data).
|
||||
- **Follow-ups:** post-merge, drop the contour `postgres-data` volume on the runner host so the next
|
||||
deploy provisions a clean DB on the new baseline; the **`scrabble-dictionary` tidy** ships as its own
|
||||
PR in that repo (sources consolidated to a single build point; byte-identical artifact).
|
||||
- **Done (cross-repo + contour):** the **`scrabble-dictionary` tidy** merged (PR #2) and was re-cut as
|
||||
the **byte-identical `v1.0.1`** release for clean provenance (the backend stays on `v1.0.0` — same
|
||||
bytes, no rewire; the backend pulls a version-pinned release artifact, not master). Post-merge the
|
||||
contour `backend` schema was wiped (`DROP SCHEMA backend CASCADE` + restart, not a volume drop) and
|
||||
re-migrated to the baseline — verified the new variant CHECK (`scrabble_en/scrabble_ru/erudit_ru`),
|
||||
`games`=0 and a clean boot.
|
||||
|
||||