Commit Graph

1 Commits

Author SHA1 Message Date
Ilia Denisov 2a48df9b83 R7: trip report + docs/tracker bake-back; mark R7 done
CI / changes (pull_request) Successful in 1s
CI / unit (pull_request) Successful in 9s
CI / integration (pull_request) Successful in 12s
CI / ui (pull_request) Successful in 37s
CI / gate (pull_request) Successful in 0s
CI / deploy (pull_request) Successful in 58s
- loadtest/REPORT-R7.md: the final stress-run report — method, the 500-player resource
  profile, the agreed tuning, the validation (transport_error 2.49% -> 0.72% at 3 gateway
  cores; the burst run showing connection-bound behavior), and the prod-sizing
  recommendation for Stage 18.
- loadtest/README.md: per-player transports, --cpus capping, docker_stats (was cAdvisor),
  the absolute BACKEND_DICT_DIR for ./loadtest/... , and report links.
- docs/TESTING.md + docs/ARCHITECTURE.md: observability now uses the otelcol docker_stats
  receiver (cAdvisor removed); links to both trip reports.
- CLAUDE.md: repo-layout line reflects docker_stats + per-service limits.
- PRERELEASE.md: R7 marked done in the tracker + heading; a Refinements entry recording
  the decisions, findings, applied tuning and validation.

This is the final pre-release hardening phase; Stage 18 (prod cutover) is next.
2026-06-11 11:18:57 +02:00