Vitest + @testing-library/jest-dom matchers wired through tests/setup.ts.
Playwright with four projects: chromium-desktop, webkit-desktop,
chromium-mobile-iphone-13, chromium-mobile-pixel-5; traces and
screenshots retained on failure.
.gitea/workflows/ui-test.yaml runs Tier 1 on every push and pull
request: monorepo Go service tests (backend with -p 1 to dodge
testcontainer contention; gateway, game, every pkg/<name> module),
pnpm install --frozen-lockfile, playwright install --with-deps,
pnpm test, pnpm exec playwright test. Uploads playwright-report
and test-results on failure. Integration suite stays gated behind
make -C integration integration; deprecated client/ excluded.
.gitea/workflows/ui-release.yaml mirrors Tier 1 on v* tag push and
keeps commented placeholders for visual regression (Phase 33) and
macOS iOS smoke (Phase 32).
ui/docs/testing.md documents both tiers and the local invocations
that mirror what CI runs. ui/PLAN.md Phase 2 marked done; Phase 3
gains a bullet to extend the go test command with ./ui/core/...;
Phase 36 has the renamed release workflow path.
tools/local-ci/ ships a self-contained docker-compose for verifying
workflows against a local Gitea + arm64 act_runner before pushing
to a real instance.
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
TestServiceStartGameEndToEnd's httptest server had no handler for
/healthz, the path engineclient.Healthz probes after a runtime
container starts. Without it the runtime never transitions out of
starting state and the test fails on its 5s deadline. Surfaced by
introducing CI that runs the backend service tests outside the
integration harness.
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>