MVP web client (Phases 1-30) is complete; reorganize planning + living docs around that.

- PLAN.md kept as the staged MVP record (1-30) with a status block + pointers; removed the 31-36 stages, regression scenarios, and deferred-TODO section (moved out); fixed a stale cross-machine plan path.

- ui/PLAN-finalize.md (new): active web-finalization plan in 8 stages (visual system, a11y, i18n, error UX, PWA, build hygiene, docs, owner manual-QA loop); absorbs former Phases 33 and 35.

- ui/ROADMAP.md (new): post-MVP (Wails, Capacitor, realistic projection, acceptance + regression scenarios) and triaged deferred follow-ups.

- ui/docs/README.md (new): grouped topic-doc index.

- De-archaeologized all 20 ui/docs topic docs + ui/README.md + ui/core/README.md: stripped Phase-N build history, rewritten as current-state; deferred work now points at ROADMAP.md / PLAN-finalize.md. Docs-only; no code change.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
Ilia Denisov
2026-05-21 23:17:51 +02:00
parent 51865b8cf4
commit a89048f6c5
26 changed files with 836 additions and 929 deletions
+4 -4
View File
@@ -1,8 +1,8 @@
# Ship Class Calculator — UX
Phase 30 fuses the ship-class designer and a calculator into one sidebar
tool (`lib/sidebar/calculator-tab.svelte`). It replaced the standalone
designer view/route from Phases 17/18. All numeric math lives in
The ship-class designer and calculator are fused into one sidebar
tool (`lib/sidebar/calculator-tab.svelte`). The standalone designer
view/route was replaced by this combined tool. All numeric math lives in
`pkg/calc` and is reached through the `Core` WASM bridge; the calculator
holds input state and orchestrates, it never computes.
@@ -36,7 +36,7 @@ in as a per-ship result rather than a separate mode.
3. **Planet area** — when an own planet is selected on the map, shows
its MAT (overridable) and the single-turn build rate (ships per turn,
turns per ship). The realistic multi-turn forecast with CAP/COL
supply is Phase 34.
supply is planned (see ../ROADMAP.md).
## Locks and goal-seek