ui/phase-16: mark stage as done after local-ci run 17

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
This commit is contained in:
Ilia Denisov
2026-05-09 20:10:56 +02:00
parent 7c8b5aeb23
commit 3442dc94f7
+4 -2
View File
@@ -1809,9 +1809,11 @@ Targeted tests:
Verified on local-ci run 16 (`success`, 4273102).
## Phase 16. Inspector — Cargo Routes
## ~~Phase 16. Inspector — Cargo Routes~~
Status: pending.
Status: done. Verified on local-ci run 17
([gitea actions](http://localhost:3000/galaxy/galaxy/actions/runs/17),
commit `7c8b5ae`).
Goal: configure up to four cargo routes per planet (colonists,
industry, materials, empty) through the inspector, with the