Commit Graph

3 Commits

Author SHA1 Message Date
Ilia Denisov e922f5f3b9 feat(deploy): continuous WAL archiving to S3 for point-in-time recovery
CI / changes (pull_request) Successful in 4s
CI / unit (pull_request) Successful in 12s
CI / integration (pull_request) Successful in 24s
CI / ui (pull_request) Successful in 1m9s
CI / conformance (pull_request) Successful in 10s
CI / gate (pull_request) Successful in 0s
CI / deploy (pull_request) Successful in 1m41s
Add pgBackRest-based PITR for the production database, shipped disarmed
(archive_mode and the base-backup timer gated off) so it stays inert until the
operator arms it before real payments — an un-armed deploy cannot pile WAL onto
the disk.

- Postgres now builds from a thin image carrying pgBackRest (archive_command runs
  in-process); the prod overlay wires an encrypted (AES-256-CBC), path-style S3
  repository with 30-day retention and a daily full base-backup systemd timer.
- Repository config/secrets flow through the PROD_PGBACKREST_* Gitea set and
  write-prod-env.sh; prod-rollback re-renders the same env so a rollback cannot
  disarm archiving.
- Grafana alerts watch pg_stat_archiver (failing / stalled), absent-safe on the
  test contour, which never archives.
- Fix the pre-migration pg_dump to snapshot the whole database (was backend-only,
  silently excluding payments).
- Document the PITR runbook, the arming sequence and the restore drill in
  deploy/README.md; record the measured cost/perf assessment.
2026-07-09 00:58:04 +02:00
Ilia Denisov 48b06f4594 docs: finalize documentation to the production state
CI / changes (pull_request) Successful in 2s
CI / unit (pull_request) Successful in 10s
CI / integration (pull_request) Successful in 16s
CI / ui (pull_request) Successful in 57s
CI / gate (pull_request) Successful in 0s
CI / deploy (pull_request) Successful in 1m21s
The project is live in production, so the staged-development scaffolding is removed.

- Delete the staged trackers PLAN.md and PRERELEASE.md.
- Rewrite CLAUDE.md: drop the per-stage workflow; codify the ongoing development
  principles (How we work) and the production model (Branching, CI & production):
  manual prod-deploy / prod-rollback, semver release tags, Ansible provisioning,
  expand-contract migrations.
- De-stage the living docs (README, ARCHITECTURE, TESTING, deploy/ansible, loadtest,
  platform/telegram READMEs) and the docker-compose tuning comments: drop the
  Stage N / R1-R7 / pre-release labels, keep every number and rationale, and fix the
  now-dangling PLAN.md / PRERELEASE.md references to describe the current state.
- Reword stale 'later stage' Go doc comments for subsystems that have shipped.
2026-06-22 08:33:30 +02:00
Ilia Denisov f5f45e7afb feat(deploy): Ansible provisioning for prod hosts (Stage 18)
Idempotent playbooks under deploy/ansible/ prepare both production hosts:
docker-ce + compose plugin, a non-sudo deploy service account holding the CI
deploy key, key-only sshd, default-deny ufw, fail2ban, unattended upgrades and
chrony. The main host also opens 80/443/9443 and creates the external edge
network; the tg host verifies direct Bot API egress (the no-VPN assumption).

The application is deployed separately by the prod-deploy workflow (later
phase), running as the deploy account this playbook provisions.
2026-06-21 23:54:57 +02:00