New scrabble/loadtest module (the pre-release stress harness): seeds 1000 guest +
10000 durable accounts with pre-created sessions directly in Postgres (token hash
matches backend/internal/session), drives virtual players through the edge protocol
(real 2-4p games assembled via invitations, mid-ranked legal moves generated locally
by the embedded scrabble-solver — the edge carries no board, so the client replays
history), plus nudge/chat/check-word/draft/profile/stats and a gateway-hammer that
verifies the rate limiter. Prints a trip-report summary (per-op latency percentiles,
result codes, live-event tally). Go unit tests cover the pure pieces; the DAWG-backed
move test runs under BACKEND_DICT_DIR.
Contour: add cAdvisor + postgres_exporter + a 'Scrabble - Resources' Grafana
dashboard and the two Prometheus scrape jobs, for the R2/R7 stress-run resource
baseline.
CI: gate ./loadtest/... (path filter + vet/build/test). Docs: TESTING, ARCHITECTURE,
project CLAUDE repo layout.
- backend + gateway multi-stage distroless Dockerfiles; the gateway embeds and
serves the SPA at / and /telegram/ via go:embed (committed dist placeholder,
real build baked in by the image's node stage)
- deploy/docker-compose.yml: backend + gateway + Postgres + Telegram connector
(VPN sidecar) + OTel Collector + Prometheus (15d) + Tempo (72h) + Grafana,
fronted by a caddy owning a single /_gm Basic-Auth (admin console + Grafana
subpath); inter-service on a private network, only caddy on the edge network
- new metrics: backend accounts_created_total{kind} (robots excluded) and an
in-memory gateway active_users{window=24h,7d} gauge
- CI: single .gitea/workflows/ci.yaml (unit/integration/ui + a gated test-contour
deploy) on the new feature/* -> development -> master branch model; the old
go-unit/integration/ui-test workflows are folded in; the connector-scoped
compose is retired (superseded by deploy/)
- docs: ARCHITECTURE §11/§12/§13, root + gateway READMEs, CLAUDE.md branching,
PLAN.md (stage 16 done + refinements + Stage 17 forward-notes)