Commit Graph

2 Commits

Author SHA1 Message Date
Ilia Denisov 422bd14b53 R2: harness payload fixes found by the smoke pass
- display-name marker: letters-only 'Zzloadtest' (the editable-name validator
  forbids digits/colons), so profile.update resends the seeded name successfully.
- draft.save: rack_order is a string in the backend draft DTO (was sent as []),
  fixing the bad_request.
Both confirmed ok against the contour. chat_not_your_turn / nudge_own_turn are
by-design turn gates (backend/internal/social/chat.go), correctly exercised.
2026-06-10 00:11:33 +02:00
Ilia Denisov aa137e3558 R2: load-test harness + contour resource observability
CI / changes (pull_request) Successful in 2s
CI / unit (pull_request) Successful in 9s
CI / integration (pull_request) Successful in 11s
CI / ui (pull_request) Successful in 38s
CI / gate (pull_request) Successful in 0s
CI / deploy (pull_request) Failing after 3s
New scrabble/loadtest module (the pre-release stress harness): seeds 1000 guest +
10000 durable accounts with pre-created sessions directly in Postgres (token hash
matches backend/internal/session), drives virtual players through the edge protocol
(real 2-4p games assembled via invitations, mid-ranked legal moves generated locally
by the embedded scrabble-solver — the edge carries no board, so the client replays
history), plus nudge/chat/check-word/draft/profile/stats and a gateway-hammer that
verifies the rate limiter. Prints a trip-report summary (per-op latency percentiles,
result codes, live-event tally). Go unit tests cover the pure pieces; the DAWG-backed
move test runs under BACKEND_DICT_DIR.

Contour: add cAdvisor + postgres_exporter + a 'Scrabble - Resources' Grafana
dashboard and the two Prometheus scrape jobs, for the R2/R7 stress-run resource
baseline.

CI: gate ./loadtest/... (path filter + vet/build/test). Docs: TESTING, ARCHITECTURE,
project CLAUDE repo layout.
2026-06-09 23:45:24 +02:00