Commit Graph

4 Commits

Author SHA1 Message Date
Ilia Denisov 8881214213 R6(a): de-stage code, docs, READMEs; split stage6_test
Mechanical, behaviour-preserving removal of Stage N / TODO-N / phase (RN)
references from comments, doc-comments, service READMEs, the current-state docs
(ARCHITECTURE, FUNCTIONAL+_ru, TESTING, UI_DESIGN), config-file comments, and the
.fbs/.proto schema comments. PLAN.md / PRERELEASE.md / CLAUDE.md keep the stage
history.

- Rename the only stage-named identifiers: registerStage8 -> registerSocialOps,
  registerStage11 -> registerLinkOps (gateway transcode).
- Split stage6_test.go: TestEmailLoginFlow -> email_test.go,
  TestGuestAutoMatchLeavesNoStats (+ provisionGuest) -> account_test.go.
- Regenerated proto bindings (push.pb.go, telegram_grpc.pb.go) from the de-staged
  .proto comments; FB Go/TS bindings unchanged (flatc strips schema comments).

go build/vet/gofmt clean across modules; integration typecheck and pnpm check green.
2026-06-10 16:56:03 +02:00
Ilia Denisov ab58062565 R3: backend rate-limit observability — ratewatch, auto-flag, admin throttled view
- accounts.flagged_high_rate_at baked into the R1 baseline (no prod data; the
  contour schema is wiped after merge); jet regenerated — the regen also picks
  up the previously missing game_drafts/game_hidden models.
- account.Store: FlagHighRate (set-once), ClearHighRateFlag, the flag in
  GetByID/ListUsers and a ListFlaggedHighRate review queue.
- New internal/ratewatch: ingests the gateway rejection reports, keeps a
  bounded in-memory episode window for the console and applies the
  conservative auto-flag (1000 rejected / 10 min, BACKEND_HIGHRATE_FLAG_*).
- POST /api/v1/internal/ratelimit/report (network-trusted, like
  sessions/resolve).
- Admin console: Throttled page (episodes + flagged accounts), a high-rate
  badge in the user list, the marker + operator clear action on the user card.
- Tests: ratewatch unit suite, report-route handler test, renderer cases,
  integration coverage for the store round-trip and the console flow.
2026-06-10 02:14:10 +02:00
Ilia Denisov f916d5e0ca Stage 17 round 5 (L2): robot play-to-win intent + next-move ETA in the admin game card
CI / changes (pull_request) Successful in 2s
CI / unit (pull_request) Successful in 8s
CI / integration (pull_request) Successful in 11s
CI / ui (pull_request) Successful in 29s
CI / gate (pull_request) Successful in 1s
CI / deploy (pull_request) Successful in 1m14s
The admin game detail now shows, per robot seat, the game's deterministic play-to-win
decision (from the bag seed) and — while it is that robot's turn — its scheduled next-move
ETA (sampled think-time delay, deferred past the sleep window), plus a caption with the
~40% global target. Wiring: robot.PlayToWin/NextMoveAt/PlayToWinTargetPercent exports,
account.IsRobot, game RobotSchedule (seed + turn-start). Tests: NextMoveAt invariants
(never early, never in the sleep window), PlayToWin export, and an admin render integration
test asserting the intent + ETA + target appear.
2026-06-07 09:42:23 +02:00
developer 3a640a17a4 Stage 10: admin console & dictionary ops (complaint review, hot-reload, broadcasts) (#11)
Tests · Go / test (push) Successful in 7s
Tests · Integration / integration (push) Successful in 13s
2026-06-04 07:27:49 +00:00