Link an email (confirm-code) or Telegram (web Login Widget) to the current
account; if the identity already has its own account, merge the two into the
one in use (the current account is primary, except a guest initiator whose
durable counterpart wins). The merge runs in one transaction
(internal/accountmerge): stats + hint wallet summed, paid_account ORed,
identities/games/chat/complaints transferred, friends/blocks de-duplicated,
the secondary kept as a merged_into tombstone so a shared finished game's
no-cascade FKs hold; a shared active game blocks the merge.
- migration 00009: accounts.paid_account, merged_into, merged_at (+ jetgen)
- internal/link orchestrator; session.RevokeAllForAccount on merge
- connector ValidateLoginWidget RPC + loginwidget HMAC validator
- edge ops link.email.request/confirm/merge, link.telegram.confirm/merge;
supersedes the Stage 8 email.bind.* surface (request never reveals 'taken'
before the code is verified, so a probe cannot enumerate addresses)
- UI Profile link section + irreversible-merge dialog; Telegram web sign-in
- focused regression tests (merge core, guest inversion, active-game refusal,
finished-shared-game kept), gateway transcode + connector + UI codec/e2e
- docs: PLAN, ARCHITECTURE 3/4/9, FUNCTIONAL(+ru), module READMEs
Engine: multi-player drop-out-and-continue with a per-game tile disposition (remove default / return), resigned seats skipped and excluded from the win, leaver rack never revealed; 2-player behaviour unchanged.
New domains (service/store, no HTTP yet): internal/social (friend request/accept graph, per-user blocks, per-game chat with nudge as a message kind, content filter via mvdan.cc/xurls/v2 + leet/separator normaliser + phone heuristic) and internal/lobby (in-memory variant-keyed matchmaking pool, friend-game invitations invite->accept with lazy 7-day expiry). account gains profile editing and the email confirm-code flow (Mailer seam: SMTP or log mailer).
Migration 00003_social.sql + regenerated jet. main wires the new services into the server (accessors for the Stage 6 handlers); robot substitution stays in Stage 5, REST/stream/push in Stage 6/8. Docs (PLAN, ARCHITECTURE, FUNCTIONAL+ru, TESTING, README) updated.