The project is live in production, so the staged-development scaffolding is removed.
- Delete the staged trackers PLAN.md and PRERELEASE.md.
- Rewrite CLAUDE.md: drop the per-stage workflow; codify the ongoing development
principles (How we work) and the production model (Branching, CI & production):
manual prod-deploy / prod-rollback, semver release tags, Ansible provisioning,
expand-contract migrations.
- De-stage the living docs (README, ARCHITECTURE, TESTING, deploy/ansible, loadtest,
platform/telegram READMEs) and the docker-compose tuning comments: drop the
Stage N / R1-R7 / pre-release labels, keep every number and rationale, and fix the
now-dangling PLAN.md / PRERELEASE.md references to describe the current state.
- Reword stale 'later stage' Go doc comments for subsystems that have shipped.
The loadtest harness never modelled game.evaluate — the debounced per-tile
play preview a real client fires several times per turn, the hottest gameplay
call. Model it (one evaluate per placed tile + reconsideration re-previews +
draft.save, human-paced; --eval / --eval-recon toggle it).
That realistic load surfaced the real bottleneck: the gateway's backend HTTP
client used the default transport (MaxIdleConnsPerHost=2), so every sync call
to the single backend host churned a fresh TCP connection — ~26500 TIME_WAIT
sockets at 500 players (near the ephemeral-port ceiling), burning ~1.75 gateway
cores while the backend sat near-idle. It was the unfixed root of the residual
transport_error the earlier passes chased on the client side.
Widen the keep-alive pool (backendMaxIdleConns=512, ~2x the observed 225-conn
peak). At 500 players the churn collapses to ~0 and peak gateway CPU drops ~7x
(~1.75 -> ~0.26 cores); postgres (~1.65 cores) becomes the busiest service.
This overturns the earlier "gateway is the binding constraint, scale it
horizontally" sizing — that was sizing around this bug, not a real floor.
Consolidate the loadtest trip reports into one loadtest/REPORT.md (drop the
R2/R7 split) and bake the finding into README / PRERELEASE / ARCHITECTURE /
TESTING.
- loadtest/REPORT-R7.md: the final stress-run report — method, the 500-player resource
profile, the agreed tuning, the validation (transport_error 2.49% -> 0.72% at 3 gateway
cores; the burst run showing connection-bound behavior), and the prod-sizing
recommendation for Stage 18.
- loadtest/README.md: per-player transports, --cpus capping, docker_stats (was cAdvisor),
the absolute BACKEND_DICT_DIR for ./loadtest/... , and report links.
- docs/TESTING.md + docs/ARCHITECTURE.md: observability now uses the otelcol docker_stats
receiver (cAdvisor removed); links to both trip reports.
- CLAUDE.md: repo-layout line reflects docker_stats + per-service limits.
- PRERELEASE.md: R7 marked done in the tracker + heading; a Refinements entry recording
the decisions, findings, applied tuning and validation.
This is the final pre-release hardening phase; Stage 18 (prod cutover) is next.
- display-name marker: letters-only 'Zzloadtest' (the editable-name validator
forbids digits/colons), so profile.update resends the seeded name successfully.
- draft.save: rack_order is a string in the backend draft DTO (was sent as []),
fixing the bad_request.
Both confirmed ok against the contour. chat_not_your_turn / nudge_own_turn are
by-design turn gates (backend/internal/social/chat.go), correctly exercised.
New scrabble/loadtest module (the pre-release stress harness): seeds 1000 guest +
10000 durable accounts with pre-created sessions directly in Postgres (token hash
matches backend/internal/session), drives virtual players through the edge protocol
(real 2-4p games assembled via invitations, mid-ranked legal moves generated locally
by the embedded scrabble-solver — the edge carries no board, so the client replays
history), plus nudge/chat/check-word/draft/profile/stats and a gateway-hammer that
verifies the rate limiter. Prints a trip-report summary (per-op latency percentiles,
result codes, live-event tally). Go unit tests cover the pure pieces; the DAWG-backed
move test runs under BACKEND_DICT_DIR.
Contour: add cAdvisor + postgres_exporter + a 'Scrabble - Resources' Grafana
dashboard and the two Prometheus scrape jobs, for the R2/R7 stress-run resource
baseline.
CI: gate ./loadtest/... (path filter + vet/build/test). Docs: TESTING, ARCHITECTURE,
project CLAUDE repo layout.