docs: finalize documentation to the production state
CI / changes (pull_request) Successful in 2s
CI / unit (pull_request) Successful in 10s
CI / integration (pull_request) Successful in 16s
CI / ui (pull_request) Successful in 57s
CI / gate (pull_request) Successful in 0s
CI / deploy (pull_request) Successful in 1m21s
CI / changes (pull_request) Successful in 2s
CI / unit (pull_request) Successful in 10s
CI / integration (pull_request) Successful in 16s
CI / ui (pull_request) Successful in 57s
CI / gate (pull_request) Successful in 0s
CI / deploy (pull_request) Successful in 1m21s
The project is live in production, so the staged-development scaffolding is removed. - Delete the staged trackers PLAN.md and PRERELEASE.md. - Rewrite CLAUDE.md: drop the per-stage workflow; codify the ongoing development principles (How we work) and the production model (Branching, CI & production): manual prod-deploy / prod-rollback, semver release tags, Ansible provisioning, expand-contract migrations. - De-stage the living docs (README, ARCHITECTURE, TESTING, deploy/ansible, loadtest, platform/telegram READMEs) and the docker-compose tuning comments: drop the Stage N / R1-R7 / pre-release labels, keep every number and rationale, and fix the now-dangling PLAN.md / PRERELEASE.md references to describe the current state. - Reword stale 'later stage' Go doc comments for subsystems that have shipped.
This commit is contained in:
@@ -3,7 +3,7 @@
|
||||
#
|
||||
# It (1) publishes caddy 80/443 — there is no host caddy in prod, so the contour caddy
|
||||
# owns the edge and does its own ACME on CADDY_SITE_ADDRESS — and the gateway bot-link
|
||||
# :9443 the remote bot dials in over mTLS; and (2) retunes the R7 limits down for the
|
||||
# :9443 the remote bot dials in over mTLS; and (2) retunes the baseline limits down for the
|
||||
# 2 vCPU / 1.9 GiB host (GOMAXPROCS=2, smaller memory caps, shorter Prometheus
|
||||
# retention). The contour launches deliberately undersized at zero players; the added
|
||||
# node_exporter + Grafana watch host memory so it can be resized at Selectel when
|
||||
@@ -29,7 +29,7 @@ services:
|
||||
ports:
|
||||
- "9443:9443"
|
||||
environment:
|
||||
# 2 vCPU host: align the Go scheduler with the cgroup quota (R7's 3 needs 3 cores).
|
||||
# 2 vCPU host: align the Go scheduler with the cgroup quota (the baseline's 3-core gateway needs 3 cores).
|
||||
GOMAXPROCS: "2"
|
||||
deploy:
|
||||
resources:
|
||||
|
||||
Reference in New Issue
Block a user