docs: finalize documentation to the production state
CI / changes (pull_request) Successful in 2s
CI / unit (pull_request) Successful in 10s
CI / integration (pull_request) Successful in 16s
CI / ui (pull_request) Successful in 57s
CI / gate (pull_request) Successful in 0s
CI / deploy (pull_request) Successful in 1m21s

The project is live in production, so the staged-development scaffolding is removed.

- Delete the staged trackers PLAN.md and PRERELEASE.md.
- Rewrite CLAUDE.md: drop the per-stage workflow; codify the ongoing development
  principles (How we work) and the production model (Branching, CI & production):
  manual prod-deploy / prod-rollback, semver release tags, Ansible provisioning,
  expand-contract migrations.
- De-stage the living docs (README, ARCHITECTURE, TESTING, deploy/ansible, loadtest,
  platform/telegram READMEs) and the docker-compose tuning comments: drop the
  Stage N / R1-R7 / pre-release labels, keep every number and rationale, and fix the
  now-dangling PLAN.md / PRERELEASE.md references to describe the current state.
- Reword stale 'later stage' Go doc comments for subsystems that have shipped.
This commit is contained in:
Ilia Denisov
2026-06-22 08:33:30 +02:00
parent 40d8f06588
commit 48b06f4594
23 changed files with 136 additions and 2387 deletions
+2 -2
View File
@@ -3,7 +3,7 @@
#
# It (1) publishes caddy 80/443 — there is no host caddy in prod, so the contour caddy
# owns the edge and does its own ACME on CADDY_SITE_ADDRESS — and the gateway bot-link
# :9443 the remote bot dials in over mTLS; and (2) retunes the R7 limits down for the
# :9443 the remote bot dials in over mTLS; and (2) retunes the baseline limits down for the
# 2 vCPU / 1.9 GiB host (GOMAXPROCS=2, smaller memory caps, shorter Prometheus
# retention). The contour launches deliberately undersized at zero players; the added
# node_exporter + Grafana watch host memory so it can be resized at Selectel when
@@ -29,7 +29,7 @@ services:
ports:
- "9443:9443"
environment:
# 2 vCPU host: align the Go scheduler with the cgroup quota (R7's 3 needs 3 cores).
# 2 vCPU host: align the Go scheduler with the cgroup quota (the baseline's 3-core gateway needs 3 cores).
GOMAXPROCS: "2"
deploy:
resources: