docs: finalize documentation to the production state
CI / changes (pull_request) Successful in 2s
CI / unit (pull_request) Successful in 10s
CI / integration (pull_request) Successful in 16s
CI / ui (pull_request) Successful in 57s
CI / gate (pull_request) Successful in 0s
CI / deploy (pull_request) Successful in 1m21s
CI / changes (pull_request) Successful in 2s
CI / unit (pull_request) Successful in 10s
CI / integration (pull_request) Successful in 16s
CI / ui (pull_request) Successful in 57s
CI / gate (pull_request) Successful in 0s
CI / deploy (pull_request) Successful in 1m21s
The project is live in production, so the staged-development scaffolding is removed. - Delete the staged trackers PLAN.md and PRERELEASE.md. - Rewrite CLAUDE.md: drop the per-stage workflow; codify the ongoing development principles (How we work) and the production model (Branching, CI & production): manual prod-deploy / prod-rollback, semver release tags, Ansible provisioning, expand-contract migrations. - De-stage the living docs (README, ARCHITECTURE, TESTING, deploy/ansible, loadtest, platform/telegram READMEs) and the docker-compose tuning comments: drop the Stage N / R1-R7 / pre-release labels, keep every number and rationale, and fix the now-dangling PLAN.md / PRERELEASE.md references to describe the current state. - Reword stale 'later stage' Go doc comments for subsystems that have shipped.
This commit is contained in:
@@ -8,8 +8,7 @@ import (
|
||||
)
|
||||
|
||||
// Service mints, resolves, and revokes sessions over the store and the
|
||||
// write-through cache. The gateway is its only caller (from a later stage); the
|
||||
// HTTP surface is wired then.
|
||||
// write-through cache. The gateway is its only caller.
|
||||
type Service struct {
|
||||
store *Store
|
||||
cache *Cache
|
||||
|
||||
Reference in New Issue
Block a user