ui: plan 01-27 done #1

Merged
developer merged 120 commits from ai/ui-client into main 2026-05-13 18:55:14 +00:00
Showing only changes of commit 5fd67ed958 - Show all commits
+4 -2
View File
@@ -1681,9 +1681,9 @@ Targeted tests:
Verified on local-ci run 11 (`success`, f80c623).
## Phase 15. Inspector — Planet Production Controls
## ~~Phase 15. Inspector — Planet Production Controls~~
Status: pending.
Status: done.
Goal: let the user switch a planet's production type to industry,
materials, research a tech field, or build a ship class; each change
@@ -1807,6 +1807,8 @@ Targeted tests:
step, gateway records the latest choice (`SHIP` + class name),
reload preserves the row through `user.games.order.get`.
Verified on local-ci run 16 (`success`, 4273102).
## Phase 16. Inspector — Cargo Routes
Status: pending.