ui: plan 01-27 done #1
+4
-2
@@ -1324,9 +1324,9 @@ Targeted tests (delivered):
|
||||
|
||||
Verified on local-ci run 4 (`success`, ce7a66b).
|
||||
|
||||
## Phase 12. Order Composer Skeleton
|
||||
## ~~Phase 12. Order Composer Skeleton~~
|
||||
|
||||
Status: pending.
|
||||
Status: done.
|
||||
|
||||
Goal: implement the empty order composer as a persistent vertical list
|
||||
that survives navigation and reloads, ready to receive commands in
|
||||
@@ -1441,6 +1441,8 @@ Targeted tests:
|
||||
- Playwright e2e: programmatically add three stub commands, reload,
|
||||
assert all three persist.
|
||||
|
||||
Verified on local-ci run 7 (`success`, 460591c).
|
||||
|
||||
## Phase 13. Inspector — Planet (Read-Only)
|
||||
|
||||
Status: pending.
|
||||
|
||||
Reference in New Issue
Block a user