ui: plan 01-27 done #1
+1
-1
@@ -2137,7 +2137,7 @@ Targeted tests:
|
|||||||
|
|
||||||
## ~~Phase 20. Inspector — Ship Group Actions~~
|
## ~~Phase 20. Inspector — Ship Group Actions~~
|
||||||
|
|
||||||
Status: done (local-ci run 26).
|
Status: done (local-ci run 27).
|
||||||
|
|
||||||
Goal: enable group operations from the inspector: split, send, load,
|
Goal: enable group operations from the inspector: split, send, load,
|
||||||
unload, modernize, dismantle, transfer to race, add to fleet.
|
unload, modernize, dismantle, transfer to race, add to fleet.
|
||||||
|
|||||||
Reference in New Issue
Block a user