ui: plan 01-27 done #1

Merged
developer merged 120 commits from ai/ui-client into main 2026-05-13 18:55:14 +00:00
Showing only changes of commit 12e666ba91 - Show all commits
+4 -2
View File
@@ -1158,9 +1158,9 @@ Targeted tests (delivered):
Verified on local-ci run 3 (`success`, fc371c7). Verified on local-ci run 3 (`success`, fc371c7).
## Phase 11. Map Wired to Live Game State ## ~~Phase 11. Map Wired to Live Game State~~
Status: pending. Status: done.
Goal: replace the map fixture with real planet data fetched from the Goal: replace the map fixture with real planet data fetched from the
gateway for the selected game; planets only, read-only. gateway for the selected game; planets only, read-only.
@@ -1322,6 +1322,8 @@ Targeted tests (delivered):
- the existing Phase 10 chrome / navigation specs still pass - the existing Phase 10 chrome / navigation specs still pass
unchanged. unchanged.
Verified on local-ci run 4 (`success`, ce7a66b).
## Phase 12. Order Composer Skeleton ## Phase 12. Order Composer Skeleton
Status: pending. Status: pending.