Ilia Denisov aee5f39a7e docs(ui): F8-05 — sync inspector topic docs with the new compact rows
Tests · UI / test (pull_request) Successful in 11m1s
- order-composer.md describes the production row's apply-gate (two
  selects + ✓/✗) and the click-to-edit entry point for planetRename.
- cargo-routes-ux.md replaces the four-slot grid description with the
  new single-row dropdown + contextual actions and notes the
  "stays on the picked type" UX rule.
- science-designer-ux.md updates the production-picker integration
  description to the dropdown pair and refreshes the e2e walkthrough
  step.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-27 13:41:44 +02:00
Ilia Denisov a89048f6c5 docs(ui): finalize MVP plan structure and de-archaeologize topic docs
MVP web client (Phases 1-30) is complete; reorganize planning + living docs around that.

- PLAN.md kept as the staged MVP record (1-30) with a status block + pointers; removed the 31-36 stages, regression scenarios, and deferred-TODO section (moved out); fixed a stale cross-machine plan path.

- ui/PLAN-finalize.md (new): active web-finalization plan in 8 stages (visual system, a11y, i18n, error UX, PWA, build hygiene, docs, owner manual-QA loop); absorbs former Phases 33 and 35.

- ui/ROADMAP.md (new): post-MVP (Wails, Capacitor, realistic projection, acceptance + regression scenarios) and triaged deferred follow-ups.

- ui/docs/README.md (new): grouped topic-doc index.

- De-archaeologized all 20 ui/docs topic docs + ui/README.md + ui/core/README.md: stripped Phase-N build history, rewritten as current-state; deferred work now points at ROADMAP.md / PLAN-finalize.md. Docs-only; no code change.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-21 23:17:51 +02:00
Ilia Denisov 7bea22b0b5 ui/phase-21: sciences CRUD list, designer, and production-picker integration
Lights up the player-defined sciences feature: a table view with sort
and filter, a designer with four percent inputs and a strict
sum-equals-100 gate, and a Research-sub-row integration so the
planet production picker lists the user's sciences alongside the
four tech buttons. Phase 21 decisions are baked back into ui/PLAN.md
(no UpdateScience on the wire — write-once via createScience +
removeScience; percentages instead of fractions; sciences live under
the existing Research segment).

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-10 21:32:37 +02:00