Commit Graph

3 Commits

Author SHA1 Message Date
Ilia Denisov 9ebb2e7f0f ci: rename workflows for Gitea UI readability
Tests · Go / test (push) Successful in 2m31s
Tests · Integration / integration (pull_request) Successful in 2m23s
Tests · Go / test (pull_request) Successful in 2m50s
Tests · UI / test (push) Successful in 13m2s
Tests · UI / test (pull_request) Successful in 13m22s
Switches the `name:` field on every workflow to the bulleted style:

  Tests · Go            (go-unit.yaml)
  Tests · UI            (ui-test.yaml)
  Tests · Integration   (integration.yaml)
  Deploy · Dev          (dev-deploy.yaml)
  Build · Prod          (prod-build.yaml)
  Deploy · Prod         (deploy-prod.yaml)

File names stay the same so existing path filters and any URL
references continue to work.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-14 00:22:53 +02:00
Ilia Denisov c6c5f3c8dd ci: skip TLS verify for actions/checkout on LAN Gitea
go-unit / test (push) Successful in 2m28s
go-unit / test (pull_request) Successful in 2m30s
integration / integration (pull_request) Successful in 2m20s
ui-test / test (push) Successful in 13m5s
ui-test / test (pull_request) Successful in 14m31s
The Gitea host serves https://gitea.iliadenisov.ru with a cert signed
by host-Caddy's internal CA, which the runner-image's CA bundle does
not trust. actions/checkout@v4 fails on `git fetch` as a result, so
every workflow on gitea.lan has been failing — visible only now that
we made gitea.lan the primary CI target.

Sets GIT_SSL_NO_VERIFY=true on every workflow as a quick fix. Safe in
practice because both endpoints sit on the same LAN. The long-term
fix is to bake the Caddy root CA into the runner image and drop this
env.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-13 23:43:51 +02:00
Ilia Denisov f316952c12 ci: split workflows for linear development flow
Reshapes .gitea/workflows/ around the new main ← development ←
feature/* branching model:

- go-unit.yaml — Go unit tests, runs on push/PR matching Go paths
- ui-test.yaml — narrowed to Vitest + Playwright only (Go tests now
  live in go-unit.yaml)
- integration.yaml — testcontainers suite, fires on PR to
  development/main and on push to development
- dev-deploy.yaml — builds the stack and (re)deploys tools/dev-deploy/
  on every merge into development
- prod-build.yaml — builds prod images on push to main and uploads
  docker save bundles as artifacts (30-day retention)
- deploy-prod.yaml — workflow_dispatch placeholder for the future
  SSH-based rollout

ui-release.yaml is removed; its v* tag trigger is superseded by
prod-build.yaml plus the manual deploy-prod entry point.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-13 23:26:46 +02:00