From 57e053764a3dae7762adcde6b55a046740dc35aa Mon Sep 17 00:00:00 2001 From: Ilia Denisov Date: Sat, 9 May 2026 11:59:49 +0200 Subject: [PATCH] ui/phase-14: mark stage done after green local-ci run 11 Co-Authored-By: Claude Opus 4.7 --- ui/PLAN.md | 2 ++ 1 file changed, 2 insertions(+) diff --git a/ui/PLAN.md b/ui/PLAN.md index fa242bd..4af2ede 100644 --- a/ui/PLAN.md +++ b/ui/PLAN.md @@ -1679,6 +1679,8 @@ Targeted tests: - Playwright e2e: rename a seeded planet, reload, confirm the new name persists; rejected path keeps the old name. +Verified on local-ci run 11 (`success`, f80c623). + ## Phase 15. Inspector — Planet Production Controls Status: pending.